Tower block restoration at Augustusplatz – Leipzig

Project description

One of the highest buildings in Leipzig (143 metres) had to be vastly refurbished. Moreover, the facilities of building had to be adapted to fit in with a state-of-the-art working environment. From the point of view of construction physics the rehearsal and recording rooms for the Leipzig Gewandhausorchester was a real challenge for all involved.

Project data & facts

Categories Working
Developer Aareal Estate Frankfurt a.M.
Construction period 2000 bis 2002
Our Services
  • Modernisation and extension
  • Inventory
  • Quotation costing
  • Cost and calculation optimisation
  • Project management
  • Project governance of three architects
Gross floor space / gross volume ca. 31.000 qm
Level of investment 35 Mio.

Go back